Portland International Jetport – DMS installed the plumbing and HVAC portion of the new Portland Jetport Baggage Claim Expansion project. The project consists of a new 300 ton chiller, cooling tower, two new AHU’s, and two new 90 BHP gas boilers.
DMS installed the plumbing and HVAC portion of the Portland Jetport Baggage Claim Expansion project. A third baggage carousel was installed and the two existing carousels were replaced. The project required installation of a new 300 ton chiller, cooling tower, two new AHU’s, and two new 90 BHP gas boilers.The entire addition has in-floor radiant heating. Radiant snowmelt was installed in the canopy areas. This was a project that required a great deal of scheduling and planning in order to keep the airport safe and running during construction.