Auburn Housing Gas Conversion

This gas conversion projects requires installation of 20 high-efficiency condensing natural gas boilers to replace antiquated oil-fired boilers in Auburn public housing.

Ten pairs of high efficiency boilers were installed to replace the old oil burners. New water heaters, pumps, controls, and gas lines were installed. Old oil tanks, lines, and boilers were removed and disposed.

Before

BEFORE

After

AFTER

BEQ Brunswick

The completed building has 250 rooms, each of which has a kitchenette, shower, water-closet and lavatory. A central laundry room, domestic hot water, and ventilation systems were also a part of this projects. Additionally, each room was heated and cooled by a natural gas fired PTAC system.

Read More